Energy Audit of Data Centre, IT Building
- sea929
- Jul 31
- 1 min read
An Energy Audit of a Data Centre Building involves a comprehensive analysis of how energy is consumed, identifying opportunities to improve efficiency, reduce operational costs, and minimize environmental impact.
Objective of Energy Audit for Data Centre Building
Evaluate current energy consumption patterns.
Identify inefficiencies in power usage.
Recommend energy-saving measures (ESMs).
Improve Power Usage Effectiveness (PUE).
Energy Saving opportunities in Data Centre Building
Typical Energy Backdrop in Data Centre Building | ||||
System | Application | % of Total Energy Utilization | Remark | |
1 | HVAC / Central Air Conditioning Systems | Maintaining Temperature and Humidity of Server Room and Other Facilities | 60 ~ 65 | Chilling Plant, Chilled Water Circulation Pumps, Cooling Tower, Air Handling System, De-Humidifiers / Hot Water Generator etc |
2 | IT Equipments | Servers & Other IT Data Equipments | 30 ~ 35 % | Servers & Other IT Data Equipments |
3 | UPS System | Backup for Power Failure | 08 ~ 10 % | UPS System (Battery Rack) |
4 | Lighting System | Lighting in Facilities | 02 ~ 05 % | Indoor & Outdoor Lighting Fixtures |
Energy Saving Opportunities in Data Centre Building
Step-I : Losses / Wastages Minimization


Step-II : Optimization



Step-III : Energy Conservation through Modification in Existing System



Step-IV : Adoption of Energy Efficient Technology






Comments